
Technologies and engineering · Aerospace EngineeringEngineering design · Structural DesignEngineering design · Mechanical Engineering
The crewed Artemis II lunar flyby has been postponed again
The crewed lunar flyby as part of the Artemis II mission has been postponed again due to technical issues with the SLS rocket. The launch, which was previously scheduled for March, has been delayed indefinitely to allow time to resolve the malfunctions.
0 —
